NYC property owners and managers should be preparing now for the July 1, 2027 lead paint abatement deadline.
Under Local Law 123 of 2023, affected apartments in pre-1960 multiple dwellings where a child under six resided as of January 1, 2025 must have the required lead paint abatement and remediation work completed by July 1, 2027. The law extends requirements previously associated with apartment turnover to occupied apartments, meaning owners generally cannot defer outstanding work until the tenant moves out.
The deadline and required work are set out in Local Law 123 of 2023 and explained in HPD’s October 2025 Lead Bulletin.
Meeting this deadline requires advance planning: identifying affected apartments, reviewing inspection reports, establishing the scope of work and coordinating access with tenants.
Which apartments are affected?
HPD identifies three deadlines for covered apartments in pre-1960 multiple dwellings. The earliest applicable deadline controls:
July 1, 2027: For apartments where a child under six resided as of January 1, 2025.
Within three years: When a child under six begins residing in the apartment after January 1, 2025.
At apartment turnover: If the apartment changes tenants sooner, the required work must be completed before the new tenant takes occupancy, regardless of whether the incoming tenant has a child.
For this requirement, “residing” includes a child under six routinely spending 10 or more hours per week in the apartment.
The requirement to abate lead-based paint on door and window friction surfaces applies even when the paint is intact, unless those surfaces were previously abated. The absence of peeling paint does not establish compliance.
Source: HPD’s required correction at turnover and in child-under-6 units guidance. This article focuses on Local Law 123’s pre-1960 multiple-dwelling requirement; other lead-paint duties can apply to additional types of housing.
What work is required?
The required scope includes:
Abating lead-based paint on door and door-frame friction surfaces.
Abating lead-based paint on window friction surfaces, with compliant replacement channels or slides among the permitted window treatments.
Correcting lead-based paint hazards and underlying defects, including leaks that cause paint deterioration.
The law permits removal or permanent covering of lead-based paint on the specified friction surfaces. The appropriate treatment must be determined for the components involved. Applying another coat of ordinary paint does not satisfy the friction-surface abatement requirement. Stabilization of deteriorated paint elsewhere is a separate part of the required work.
Source: Local Law 123, § 27-2056.8(a)(1–4).
Completing XRF testing does not complete the required corrective work
Owners who have completed their XRF inspections should review the findings alongside any previous abatement records.
The XRF report identifies where lead-based paint is present. Those findings provide the basis for determining which components require treatment and preparing an accurate scope of work. An inspection report alone does not demonstrate that required abatement has been completed.
This review should take place before work is priced or scheduled. It helps establish what remains outstanding and provides a clear basis for budgeting and contractor proposals.
HPD separately requires records of XRF testing and completed corrective work.
Occupied apartments require advance coordination
Completing abatement in an occupied apartment requires a documented plan for access, tenant protection and scheduling.
Where the work cannot be performed safely with occupants remaining in place, the owner must provide appropriate temporary relocation. HPD specifies suitable, decent, safe and similarly accessible housing without lead-based paint hazards. This needs to be addressed during planning, before work begins.
If necessary temporary relocation is refused, the owner must document good-faith efforts to perform the work and the occupant’s refusal. Local Law 123 provides for an exemption only upon HPD’s approval of the required documentation; it is not automatic and lasts until turnover to a new occupant.
Sources: HPD’s relocation guidance and Local Law 123, § 27-2056.8(e).
Work intended to permanently remove lead-based paint must be performed by an EPA-certified lead-based paint abatement firm using certified workers and supervisors and required safe work practices. Renovation, Repair and Painting (RRP) certification alone is not a substitute for abatement certification when abatement is required. Some work requires both certifications.
Dust-wipe clearance testing must be performed by an EPA-certified lead-based paint inspector or risk assessor independent of both the owner and the contractor who performed the work.
Sources: HPD Safe Work Practices and EPA’s Lead-Based Paint Abatement and Evaluation Program.
Documentation is part of compliance
Owners should maintain a complete record for each apartment, including the XRF report, scope of work, firm and worker certifications, safe work practice documentation, completion affidavits and independent dust-wipe clearance results and sampling records.
Lead compliance records must be retained for at least 10 years. Keep records of access and scheduling attempts, especially if work remains incomplete. A contractor’s invoice alone does not replace the required documentation demonstrating how the work was performed and verified.
Sources: HPD Required Audit Compliance and Record-Keeping and HPD’s safe-work documentation requirements.
For owners and managers overseeing multiple buildings, we recommend a central register identifying each affected apartment, its applicable deadline, outstanding work and the person responsible for completion.
Preparing for July 2027
Our recommendation is to begin reviewing affected apartments now. Establishing the scope early gives owners time to budget, coordinate tenant access and complete the work and clearance testing before the deadline.
Resi Comply helps property owners review inspection findings, define the required corrective work and coordinate abatement, independent clearance testing and supporting documentation.
To establish the next steps for your property, send us your XRF reports and apartment details. Our team will review the information and provide a clear scope, pricing and schedule.
Contact Resi Comply to discuss your building’s requirements.
To plan corrective work for your building, review our NYC lead abatement and violation removal services. Send your inspection findings and any agency notice so the scope can be reviewed.
NYC property owners and managers should be preparing now for the July 1, 2027 lead paint abatement deadline.
Under Local Law 123 of 2023, affected apartments in pre-1960 multiple dwellings where a child under six resided as of January 1, 2025 must have the required lead paint abatement and remediation work completed by July 1, 2027. The law extends requirements previously associated with apartment turnover to occupied apartments, meaning owners generally cannot defer outstanding work until the tenant moves out.
The deadline and required work are set out in Local Law 123 of 2023 and explained in HPD’s October 2025 Lead Bulletin.
Meeting this deadline requires advance planning: identifying affected apartments, reviewing inspection reports, establishing the scope of work and coordinating access with tenants.
Which apartments are affected?
HPD identifies three deadlines for covered apartments in pre-1960 multiple dwellings. The earliest applicable deadline controls:
July 1, 2027: For apartments where a child under six resided as of January 1, 2025.
Within three years: When a child under six begins residing in the apartment after January 1, 2025.
At apartment turnover: If the apartment changes tenants sooner, the required work must be completed before the new tenant takes occupancy, regardless of whether the incoming tenant has a child.
For this requirement, “residing” includes a child under six routinely spending 10 or more hours per week in the apartment.
The requirement to abate lead-based paint on door and window friction surfaces applies even when the paint is intact, unless those surfaces were previously abated. The absence of peeling paint does not establish compliance.
Source: HPD’s required correction at turnover and in child-under-6 units guidance. This article focuses on Local Law 123’s pre-1960 multiple-dwelling requirement; other lead-paint duties can apply to additional types of housing.
What work is required?
The required scope includes:
Abating lead-based paint on door and door-frame friction surfaces.
Abating lead-based paint on window friction surfaces, with compliant replacement channels or slides among the permitted window treatments.
Correcting lead-based paint hazards and underlying defects, including leaks that cause paint deterioration.
The law permits removal or permanent covering of lead-based paint on the specified friction surfaces. The appropriate treatment must be determined for the components involved. Applying another coat of ordinary paint does not satisfy the friction-surface abatement requirement. Stabilization of deteriorated paint elsewhere is a separate part of the required work.
Source: Local Law 123, § 27-2056.8(a)(1–4).
Completing XRF testing does not complete the required corrective work
Owners who have completed their XRF inspections should review the findings alongside any previous abatement records.
The XRF report identifies where lead-based paint is present. Those findings provide the basis for determining which components require treatment and preparing an accurate scope of work. An inspection report alone does not demonstrate that required abatement has been completed.
This review should take place before work is priced or scheduled. It helps establish what remains outstanding and provides a clear basis for budgeting and contractor proposals.
HPD separately requires records of XRF testing and completed corrective work.
Occupied apartments require advance coordination
Completing abatement in an occupied apartment requires a documented plan for access, tenant protection and scheduling.
Where the work cannot be performed safely with occupants remaining in place, the owner must provide appropriate temporary relocation. HPD specifies suitable, decent, safe and similarly accessible housing without lead-based paint hazards. This needs to be addressed during planning, before work begins.
If necessary temporary relocation is refused, the owner must document good-faith efforts to perform the work and the occupant’s refusal. Local Law 123 provides for an exemption only upon HPD’s approval of the required documentation; it is not automatic and lasts until turnover to a new occupant.
Sources: HPD’s relocation guidance and Local Law 123, § 27-2056.8(e).
Work intended to permanently remove lead-based paint must be performed by an EPA-certified lead-based paint abatement firm using certified workers and supervisors and required safe work practices. Renovation, Repair and Painting (RRP) certification alone is not a substitute for abatement certification when abatement is required. Some work requires both certifications.
Dust-wipe clearance testing must be performed by an EPA-certified lead-based paint inspector or risk assessor independent of both the owner and the contractor who performed the work.
Sources: HPD Safe Work Practices and EPA’s Lead-Based Paint Abatement and Evaluation Program.
Documentation is part of compliance
Owners should maintain a complete record for each apartment, including the XRF report, scope of work, firm and worker certifications, safe work practice documentation, completion affidavits and independent dust-wipe clearance results and sampling records.
Lead compliance records must be retained for at least 10 years. Keep records of access and scheduling attempts, especially if work remains incomplete. A contractor’s invoice alone does not replace the required documentation demonstrating how the work was performed and verified.
Sources: HPD Required Audit Compliance and Record-Keeping and HPD’s safe-work documentation requirements.
For owners and managers overseeing multiple buildings, we recommend a central register identifying each affected apartment, its applicable deadline, outstanding work and the person responsible for completion.
Preparing for July 2027
Our recommendation is to begin reviewing affected apartments now. Establishing the scope early gives owners time to budget, coordinate tenant access and complete the work and clearance testing before the deadline.
Resi Comply helps property owners review inspection findings, define the required corrective work and coordinate abatement, independent clearance testing and supporting documentation.
To establish the next steps for your property, send us your XRF reports and apartment details. Our team will review the information and provide a clear scope, pricing and schedule.
Contact Resi Comply to discuss your building’s requirements.
To plan corrective work for your building, review our NYC lead abatement and violation removal services. Send your inspection findings and any agency notice so the scope can be reviewed.

Control starts now
Take control of your compliance
Take control of your compliance
Bring your compliance into one system — with full visibility, control, and expert support
Bring your compliance into one system — with full visibility, control, and expert support

Control starts now
Take control of your compliance
Bring your compliance into one system — with full visibility, control, and expert support